A fabrication programme is not only about how quickly parts can be made. It is about which parts are needed first, and whether the site has somewhere to put them when they arrive.
Build in erection order
The most useful dispatch sequence is the erection sequence. Frames, braces and connections should be grouped so that each delivery supports the next stage of assembly rather than filling the laydown area.
Think about lifts
Member length and weight decide how a piece can be handled. A component that is technically correct but difficult to lift creates delay and risk. Discuss lifting constraints while the fabrication approach is still flexible.
A buildable frame is a coordination achievement as much as a fabrication one.
Leave room for verification
Dimensional checks belong between stages, not at the end. Verify sub-assemblies before they are built into larger ones so a correction stays local.
Sequence is a design decision. Treat it with the same care as the drawing itself.